• Contact Us
  • New Tenders
  • Register
  • Login

Supply of Mud / Brine Pump

OmanTender notice for Supply of Mud / Brine Pump. The reference ID of the tender is 60310859 and it is closing on 07 Dec 2021.

Tender Details

  • Country: Oman
  • Summary: Supply of Mud / Brine Pump
  • OMT Ref No: 60310859
  • Deadline: 07 Dec 2021
  • Financier: Self Financed
  • Purchaser Ownership: -
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: STC.211111.OPS.S169
  • Purchaser's Detail:
  • Purchaser : ABRAJ ENERGY SERVICES (SAOC)
    Al-Mawaleh, PO Box 1156, PC 130, Azaiba Tel: +968-24509999 Fax: +968-24509998
    Email :Contract@abrajoman.com/ Tender.STC@abrajoman.com

  • Description:
  • Supply of Mud / Brine Pump Electric motor driven pump, capable of maintaining an output of 1.2m3/minute at 11,500 kPa with a maximum operating pressure of 21,000 kPa. A relief valve set to maximum operating pressure (21,000kPa) + 10% shall be fitted. Relief valve (PRV) shall be certified to API-7K ยงย  Forged steel fluid ends. ยงย  Closed loop cooling/lube oil system for liners ยงย  Suction and discharge filter completed with bleed-off valves upstream of discharge filter. ยงย  Full range liners and pistons to operate at the parameters specified in the above. ยงย  Pulsation dampeners on discharge line, same rating as high-pressure lines. Discharge line shall be dipping down from relief valve and secured. Pulsation dampeners shall be forged and carry the ASME U or UM mark. ยงย  Suction line 6โ€. ยงย  Adjustable / resettable pressure relief valve set to maximum operating pressure (21,000 kPa +10%) flanged or hammer union. Threaded connections are forbidden. Relief lines for pumps shall be sloping gently downwards and shall be suitably anchored. ยงย  Dedicated centrifugal charge pump. ยงย  Trailer mounted for full mobility with suspension designed for moves over rough terrain. ยงย  Pressure gauge in kPa before isolation valve - flanged connection, threaded connection not allowed. ยงย  Rigid covers to enclose all moving parts. ยงย  Drip tray to contain spills. ยงย  Mud/brine pump discharge line shall have 2" nominal through bore, with 2.1/16" nominal through bore gate valves, 21,000 kPa WP. Flexible (vibrator) hoses according to API grade D, API Spec 7K-, FSL 1, temperature range II, and to be equipped with snubbing lines (min 3/8โ€ dia) and integral couplings. Pump Discharge Lines "High pressure manifold (3 x valves, WP 21,000 kPa, with 1502 WECO welded connections 2"" x 2"") All the discharge lines (Chicksans/hoses) need to have unique identification number, working pressure and last test date.ย " Mud/Brine Tank System "ยงย  Sectionised circulation tank capacity 30mยณ wheel mounted for water or brine. The active suction tank shall be dimensioned such to provide a meaningful reading for level change for 1 m3 volume change. The settling compartment shall be provided with a screen of appropriate meshing and a minimum 8"" butterfly dump valve. Reserve tank, dump/oil tank, shale shaker tank, Trip tank shall design in one-wheel mounted trailer " "ยงย  Pill tank capacity of 10 mยณ wheel mounted with electric centrifugal transfer pump. (mud agitators to be installed and dump valve shall be lockable). Also, transfer line valves shall be lockable when mechanical isolation is needed. Brine/mixing tank & mud pump with hopper shall design in one-wheel mounted trailer." "ยงย  Reserve tank capacity 55mยณ wheel mounted with electric centrifugal transfer pump. Reserve tanks shall line up with hopper to have the flexibility of mixing" ยงย  Shale shaker tank capacity of 5mยณ wheel mounted with electric centrifugal transfer pump "ยงย  Trip tank capacity of 5mยณ wheel mounted with electric centrifugal transfer pump. It shall have a level indicator and calibrated with drill pipe in use. In addition, it has to meet the following criteria: Trip pump motor Cables should be routed to power house through the carrier not through the mud tanks to faciltate advance release and move for mud tanks without the need to wait to the end of operation. Motor should be fixed to the tank only after welding jobs completed to avoid bearing damage due to welding cables improper connections Cables must be marked properly at both ends using stainless steel cable id tags. Cable size, gland size and thread type, connectors sizes all should be identified properly to eliminate the need of using adapters/reducer" Sized to give level change of at least 5 cm for each stand of open ended drill pipe. Filled from flowline with a facility to bypass. Served by dedicated pump to give; 1mยณ/min (min) across the bell nipple or to fill drill pipe. Returns from choke manifold shall be routed through degasser to the trip tank.
  • Documents:

 Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
OmanTender Features

OmanTender Features

Fresh and verified Tenders from Oman. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM
Tender Experts

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Oman in your email inbox.

  Chat with us